Ocado Purfleet Customer Fulfilment Centre (CFC)

Ocado’s fifth Customer Fulfilment Centre (occupies the entire 19 acre site, which is located inside the M 25 alongside the A13 The unit at SEGRO Logistics Park Purfleet combines the space, power and connectivity to house Ocado’s cutting edge, robotic packing
operation, achieving a BREEAM Excellent sustainability rating.

Due to our extensive knowledge of the Ocado operation we were appointed to perform enhanced design and monitoring for the Mechanical Electrical, Sprinkler, Refrigeration Insulated Structure installations.

Our compliance team were responsible for monitoring and checking the quality of works on site along with commissioning testing for services to ensure that the building had full functionality to the required design parameters.

Services Performed:

Year:

2020

Location:

Purfleet

Client:

Ocado

Footprint:

30,000 m2

Total FA:

47,000 m2

Height:

13m